incinerator technical request

Cyclone separator Electrostatic precipitators Fabric filters 6 Chimney / Stack 1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account. 2. If possible the chimney should be visible to the operator from the feeding area. 3. The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable. 4. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed  x 2) whichever is higher to ensure no down washing of exiting gases. 5. Point for the measurement of emissions shall be provided. 7 Instrumentation Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers. 2. An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the  required temperature. 3. In addition to the above the following instruments may also be required. A carbon monoxide and/or oxygen meter/recorder A smoke density meter/recorder A gas flow meter/recorder A solid particulate meter/recorder Any other instrument or measurement that may be considered necessary 8 Emission Limits 1. Combustion efficiency: Combustion efficiency (CE) shall be at least 99.00% The Combustion efficiency is computed as follows; C.E= % CO 2 x 100 % CO2 + CO 2. The temperature of the primary chamber shall be 800 ± 50o C 3. The secondary chamber gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack  gas. 4 Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes 5. All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets. 6. The Authority may require that the certificate holder have tests carried out by an accredited institution to determine  stack and/or ground level concentrations of the following substances.

Small Biomedical Incinerator

for the Solid waste, we would like something in mid-range with the capacity for wood/paper and Reeds/Plants  for the Bio Gas. Technical Specification For Small Biomedical Incinerator Single Burner (Diesel) Two Chambers Capacity 10-15kgs/batch Chamber Volume 0.125 m3 with control panel Operating Temp max 700 0 C-13000C  If you have another Incinerator  for a SOLID WASTE BURNER or INCINERATOR, could you please quote me as well? And it must be electrically operated. It must also be containerised so it can be easily move to different location. 1) HIGH CAPACITY HIGHLY PRODUCTIVE PET      CREMATION MACHINE – QUANTITY: 1 UNIT     – SIZE: 8 TO 15 ANIMAL PER DAY     – WASTE TYPE: CATS, DOGS, RABBITS, BIRDS, OTHER DOMESTIC ANIMALS     – CONSTRUCTION: STEEL STRUCTURE WITH HIGH GRADE PAINT SYSTEM     – ACCESSORIES: HYDRAULIC LIFT TABLE     – TEMPERATURE: RATED AT 1430 DEGREE CELSIUS provide and train the staff of the DGSP, in a common solid waste incinerator composed of food scraps, rags, remains of packaging, cardboard, plastic envelopes and all types of waste Type IV according to the NFPA (National Fire Protection Association) standard. Type of waste according to NFPA: 2 Capabilities in Lb / Hra. Waste: 600 Lbs / Hra Heat capacity of BTU waste: 4,500 BTU / lb Height of the chimney: 15 meters. Cyclone separator of dry particles Cyclone separator of wet particles Gas scrubber Third Chamber supplementary burner Terrace and stairs for gas measurement Automatic ash extractor Equipment for temperature recording Equipment for gas monitoring

burning rate 30kgsh solid waste incinerator

1 burning rate must be Average 30kgs\h 2 inside of chamber material must be refractory concrete cement 3 it works in three system diesel oil\ Natural gas or LPG 4 voltage must be 220V  5 inside temperature first must be 1000c  and second must be 1200c 6 pipe length must be 20 M We are looking to purchase a high capacity and efficiency incinerator that will be suitable for their needs, say up from 300-500kg per day, and upwards. So could you kindly send us your product range, with specifications (including their sizes/measurements, especially external) 1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing system. 2.      Working hour /day: minimum 10 hours/day. 3.      Capacity: Approximated 150 kg/hr. Over 10 hrs. 4.      Wastes characteristics:  BULK density: 70 – 100 kg/ bm3.  Calorific value: 2000-3000 kcal / hr.  Moisture content: 20-30%by weight.  Ash content: 2 – 8 % by weight.  Plastic content: 15-20 % by weight. 5.      Two combustion chambers. 6.      Operating temperatures:  First chamber: not less than 700 800 °c.  Second chamber: not less than 1200 °c (during steady operation). 7.      The burners should be automatically switched off if any of the combustion chambers doors is open. 8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel). 9.      Automatic loader and unloader to be provided. 10.     Exhaust gases to be comply with International Environmental code and requirements.

install incinerators

1. Can we install the unit without a roof?  ( are all electrical parts weatherproof and machine installed out door)? 2. What is the oil tank capacity supplied with the unit 3. Is the unit is supplied assembled form, except chimney? 4. Other than a concrete base what else needed to erect machines We are an Engineering consulting firm in Zambia, Southern Africa, that deals in Building engineering services and would like to have a catalogue including technical specifications of various sizes of incinerators. We would like to have the FOB prices of all the incinerators as well from where you are. 1. What is the different between oil and gas incinerator in term of performance?  2. What is the cost difference between oil and gas incinerator?  3. How much area required to install one 500kg/hour incinerator? do you have a sample floor layout?  4. Do you have some pictures of this incinerator install in some other place?  5. Do you have a video presentation of how this incinerator work?  the unit being offered is also designed for burning the waste  petroleum products for a diesel power plant  and not just a medical/hospital related waste incinerator.  Please provide us with detailed capacity of handling the following products and the product tst data and operation manual to consider the product: 1. Used petroleum oil; and  2. Solid waste, petroleum contaminated filters, rags etc.

Containerized Mobile Incinerator

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities Read more about Containerized Mobile Incinerator[…]

Animal wastes incinerators

Version , the entire carcass of animals ( cattle , horses , Sheep, pigs , etc.) , as well as biologically hazardous waste Products in the fuel stove . ? Opening Doors – the closure and fixation automated system , Which are managed remotely by the operator . ? designed to work in long mode and fast Action ( Quick Start EP – i)  Fully mobile – mounted on wheeled chassis Even during the operation . Incinerators must be provided As standard equipment a special truck  air retention for at least 2 seconds at a temperature of less than 850C, the combustion In order to achieve the proper effect. must be a two-chamber incinerators, primary and secondary Fuel stoves The waste products to reduce the initial volume Possible to minimize (approximately 5% sterile ash Form). Incinerators should be provided in the fuel tank (diesel ) The minimum capacity of the animal carcass incinerator The destruction of 1000 kg / hour. Incinerator capacity is calculated 8MJ/kg- material and 60 % humidity. It must be possible to use the incinerator +40  C to – 15 0C Temperature and 5% – 95% – of moisture conditions. ? PLC controller and a built-in temperature panelita complete Automatic control, a control computer, which is stored   Information on the variation of temperature with respect to time and Graphic images. must have fuel with automatic control and malfunction Detection system. ?the ability to pre- warm-up , body waste burning on and off Consistency is independent of the first and secondary chambers. ensuring the incinerator with electricity , it Must be installed on the generator. clean the incinerator should be simple tools , Without using any additional equipment Incinerator to burn 25 to 30 kg/hr of waste Double Chamber Low maintenance with diesel filled and no more than 15amp 220 C 250 V KW must be stated. Onboard or inbuilt fuel storage tank, no more than 12L of diesel/hr Simple start for less operator training skills System to accommodate low power and frequent supply problems